Barry Boehm

Image of Barry Boehm
Agile methods derive much of their agility by relying on the tacit knowledge embodied in the team, rather than writing the knowleadge down in plans.
- Barry Boehm
Collection: Team
Image of Barry Boehm
Poor management can increase software costs more rapidly than any other factor.
- Barry Boehm
Collection: Teamwork
Image of Barry Boehm
Poor management can increase software costs more rapidly than any other factor. Particularly on large projects, each of the following mismanagement actions has often been responsible for doubling software development costs.
- Barry Boehm
Collection: Cost
Image of Barry Boehm
About 90 percent of the downtime comes from, at most, 10 percent of the defects.
- Barry Boehm
Collection: Downtime
Image of Barry Boehm
Negotiation builds a team as well as a set of requirements.
- Barry Boehm
Collection: Team
Image of Barry Boehm
If a project has not achieved a system architecture, including its rationale, the project should not proceed to full-scale system development. Specifying the architecture as a deliverable enables its use throughout the development and maintenance process.
- Barry Boehm
Collection: Maintenance
Image of Barry Boehm
Stop the life cycle-I want to get off!
- Barry Boehm
Collection: Want
Image of Barry Boehm
Software engineering economics.
- Barry Boehm
Collection: Engineering